Deliverables/ Milestones

28-02-2019

The attached document is the Final Technical Report of the LIFE-Stymfalia project. The Final Report was submitted on 28 February 2019 to the European Commission, covering the project’s duration (1/10/2013-28/09/2018). It includes a description of all the activities undertaken within the project’s lifespan and an evaluation of the project results and impacts.

Download the PDF file

28-02-2019

The attached document is the Executive Summary of the Final Report of the LIFE-Stymfalia project.

Download the PDF file

17-10-2018

We stand at the finishing line of LIFE-Stymfalia project. The 6th newsletter, describes the latest achievements aiming at the restoration of Lake Stymphalia.